View all questions & answers for the NSE 6 - Network Security 7.6 Support Engineer Materials exam


NSE 6 - Network Security 7.6 Support Engineer Materials-Question 31 Discussion

In a Security Fabric environment, which three actions must you take to ensure successful communication among the nodes? (Choose three answers)

  • A. You must ensure that TCP port 8013 is not blocked along the way.
  • B. You must authorize the downstream FortiGate on the root FortiGate.
  • C. You must enable FortiTelemetry on the receiving interface of the upstream FortiGate.
  • D. You must configure FortiGate in transparent mode.
  • E. You must ensure that the port for Neighbor Discovery has been changed.
Correct Answer: A,B,C

Brave-Dump Clients Votes

ABC 100%

Comments



Brave-Dumps.com Admin 2025-11-06 16:29:54

Selected Answers: A, B, C


as per study guide page 129


Anonymous User 2026-04-05 18:47:44

Selected Answers: A, B, C


Network_Security_Support_Engineer_7.6_Study_Guide Page 127 - 129